The Equation Series
Menu

Manufacturing · Profile from Manufacturing Research Companion: Companies, Strategic Moves, and Technical Studies

Intel Foundry

The manufacturing half of Intel — the fabs in Oregon, Arizona, New Mexico, Ireland and Israel, the unbuilt Ohio site and the process roadmap from Intel 7 to 18A and 14A — told here as a factory story. The company and AI angle (missing mobile, the AI-accelerator misses, Gelsinger's exit, Nvidia's investment, the reported Apple deal and the 2026 equity raise) is in AI: Intel; this profile keeps every shared figure equal to it. Intel Foundry's story turns on process capability lost, then rebuilt at enormous fixed cost — and utilisation that needs outside customers. For three decades Intel's fabs were the best in the world and its "Copy Exactly!" method let it run a new process identically in several fabs at once. Then 10 nm slipped for years (2015–19) and TSMC took the lead. From March 2021 Intel committed to IDM 2.0 — five nodes in four years, a foundry for others and fabs in Arizona, Ohio, Germany and Poland — and spent ~$25bn a year on capex while revenue fell. By 2026 18A was in volume at Fab 52 in Arizona, the Germany and Poland projects had been cancelled (Jul 2025), Ohio's first fab had moved to 2030–31, the CHIPS award had been converted into a ~9.9% government stake (22 Aug 2025), and Intel Foundry still lost $1,853m in Q3 2026 on $6,697m of revenue, most of it from Intel's own products (Shared facts).

At a glance

Founded
Intel founded 18 Jul 1968 (equal to AI); "Intel Foundry Services" announced 23 Mar 2021 with IDM 2.0; Intel Foundry reported as a separate segment from 2024 and made a subsidiary (announced Sep 2024) (equal to AI)
Headquarters
Santa Clara, California (Intel); main fab campuses in Hillsboro, Oregon (process development), Chandler, Arizona (Ocotillo), Rio Rancho, New Mexico (packaging), Leixlip, Ireland, and Kiryat Gat, Israel (company, verify list); Ohio One in New Albany, Ohio, under construction
Ownership / structure
A segment and subsidiary of Intel Corporation (Nasdaq: INTC). The US government holds ~9.9% of Intel (433.3m shares at $20.47 ≈ $8.9bn, 22 Aug 2025) plus a five-year warrant for 5% more at $20, exercisable only if Intel ceases to own at least 51% of the foundry (equal to AI); Nvidia ~4% (~$5bn at $23.28, closed 26 Dec 2025); SoftBank $2bn at $23 (Aug 2025). Brookfield owns 49% of the Arizona expansion (Fabs 52 and 62, from memory, verify) and Apollo 49% of the Irish Fab 34 joint venture (equal to AI)
Leadership (2026)
Lip-Bu Tan, Intel CEO since 18 Mar 2025; Naga Chandrasekaran, Intel Foundry chief technology and operations officer (title verify, equal to AI); David Zinsner, CFO
Process roadmap
Intel 7, Intel 4, Intel 3 (shipping); 20A cancelled (Sep 2024); 18A (RibbonFET gate-all-around transistors, PowerVia backside power) in volume at Fab 52; 18A-P in risk production; 14A (first node designed around High-NA EUV) — 0.9 PDK released Oct 2026, internal risk production 2H 2027 (Shared facts; equal to AI)
Scale
Q3 2026 (29 Oct 2026): Intel Foundry revenue $6,697m (+58% from $4,235m), operating loss $1,853m (vs $2,321m) (Shared facts). Full-year operating losses ~$13.4bn (2024) and ~$10.3bn (2025) (equal to AI, reported). Intel capex ~$25bn a year in 2022–24 (equal to AI, verify) and ~$20bn planned for 2026 (reported, verify)
Signature moves (incl. failures)
"Copy Exactly!" fab replication (1990s); 10 nm and the loss of process leadership (2015–20); IDM 2.0 and Intel Foundry Services (2021); Brookfield and Apollo fab co-investment (2022–24); Ohio One groundbreaking and the delay to 2030–31 (2022–25); Intel Foundry as a subsidiary and 20A cancelled (2024); the CHIPS award and its conversion into the government stake (2024–25); Magdeburg and Wrocław cancelled (2025); 18A and Panther Lake at Fab 52 and the foundry losses (2025–26)

9 strategic moves analysed

Each one gets a full strategy file in the companion: context, the decision, the financing, what happened, and the lesson.

  1. 1990

    Copy Exactly Fab Replication

    Production-system change (process transfer method)

  2. 2015

    10nm and the Loss of Process Leadership

    Technology bet (process node) — failure

  3. 2021

    IDM 2 0 and Intel Foundry Services

    Strategy pivot; new plants (greenfield and expansion); foundry launch

  4. 2022

    Brookfield and Apollo Fab Co Investment

    Financing; joint venture (minority stakes in fab projects sold to infrastructure and private-credit investors)

  5. 2022

    Ohio One Groundbreaking and the Delay to 2030

    New plant (greenfield) — delayed

  6. 2024

    CHIPS Award and the Government Stake

    Government award, then government equity stake

  7. 2024

    Intel Foundry Subsidiary and 20A Cancelled

    Restructuring (separation of the foundry into a subsidiary); technology change (node cancelled); footprint pause

  8. 2025

    18A Panther Lake at Fab 52

    Product and process launch (new node in volume); new plant (Fab 52) and expansion (Fab 62)

  9. 2025

    Magdeburg and Wroclaw Cancelled

    Footprint consolidation; cancellation of greenfield plants (failure of a plan)