LONGi Green Energy

The Xi'an company that bet in 2000 that solar would run on monocrystalline silicon rather than the cheaper multicrystalline wafers that dominated the industry, drove the cost of mono wafers down with diamond-wire sawing and sheer scale until multi all but disappeared (by ~2020), bought its way into modules with Lerri Solar (2014–15) and became, by 2020–22, the world's largest module shipper (industry rankings, reported). Then the industry it helped build overbuilt: China's polysilicon-to-module capacity ran far ahead of world demand, module prices fell to ~$0.10/Wdc (China export, 2024) and LONGi lost ~CNY 8.6bn in 2024 — its first annual loss in twelve years — then ~CNY 6.4bn in 2025 and ~CNY 3.7bn in H1 2026 (company, reported). Its answer is back-contact (BC) cells; its US story runs from UFLPA detentions (2022–23) and Southeast Asian tariffs to a minority stake in Illuminate USA, a ~5 GW module factory in Ohio. LONGi is the book's case that winning the cost war does not guarantee profits in a glut.

At a glance

Founded
Feb 2000, Xi'an, Shaanxi (as Xi'an Xinlong / LONGi Silicon; reported), by Li Zhenguo, Li Xiyan, Zhong Baoshen and partners (reported)
Headquarters
Xi'an, China
Ownership / structure
Public, Shanghai Stock Exchange: 601012 (listed Apr 2012, reported); founders remain the largest individual holders (Li Zhenguo, Li Xiyan, Zhong Baoshen; verify current stakes)
Leadership (2026)
Zhong Baoshen (chairman, verify); Li Zhenguo (founder, president, verify); management changes in 2025–26 not web-checked (verify)
Assets
Wafer (ingot pulling and slicing) plants in Shaanxi, Ningxia, Yunnan and Inner Mongolia; cell and module plants in China and Southeast Asia (Malaysia, Vietnam; verify current status after Solar III duties); ~49% of Illuminate USA (Pataskala, Ohio, ~5 GW modules, with Invenergy ~51%) as last widely reported (2024–25) — whether LONGi still holds it after the 2025 FEOC rules is unconfirmed (verify); LONGi Hydrogen (alkaline electrolysers, from 2021)
Scale
2025: revenue ~CNY 70.3bn (~$9.8bn), net loss attributable ~CNY 6.42bn, module shipments ~86.6 GW, wafer shipments ~111.6 GW (company, 28 Apr 2026). H1 2026: revenue ~CNY 27.05bn (−17.6% y/y), net loss ~CNY 3.68bn, modules ~29.9 GW (−24% y/y), BC modules ~19.6 GW (>65% of modules), overseas >65% of module revenue (company, reported Aug–Sep 2026)
Price benchmarks
Chinese module export price ~$0.10/Wdc (2024) and ~$0.085–0.095/Wdc Tier-1 TOPCon early 2026 (BNEF via secondary reports, verify); US module prices ~$0.25–0.30/Wdc (2024–25, verify); polysilicon ~CNY 300/kg peak (2022) → ~CNY 35–40/kg (2024, verify)
Signature moves (incl. failures)
Founding and the mono bet (2000); Shanghai listing (2012); Lerri Solar and modules (2014–15); the mono-over-multi wafer price war (2016–19); world's largest module maker (2020–22); UFLPA detentions and Southeast Asian tariffs (2022–25); Illuminate USA (2023); the glut and first annual loss (2024); the back-contact bet (2022–26)

9 strategic moves analysed

Each one gets a full strategy file in the companion: context, the decision, the financing, what happened, and the lesson.

  1. 2000

    Founding and the Monocrystalline Bet

    Founding / technology bet

  2. 2012

    Shanghai Listing

    Spin-off or IPO

  3. 2015

    Lerri Solar and the Move into Modules

    Acquisition or merger / vertical integration

  4. 2016

    Mono Wafer Price Cuts and the Defeat of Multi

    Technology bet / pricing strategy

  5. 2020

    Worlds Largest Module Maker

    Construction or commissioning / capacity expansion

  6. 2022

    UFLPA Detentions and Southeast Asia Tariffs

    Regulatory or legal action / trade remedy (failure of a route to market)

  7. 2023

    Illuminate USA Ohio JV

    Joint venture / construction (US manufacturing)

  8. 2024

    Back Contact HPBC 2 Bet

    Technology bet

  9. 2024

    Polysilicon Glut and First Annual Loss

    Restructuring / market collapse (failure)