The former ABB Power Grids — the world's largest maker of power transformers and the leading supplier of high-voltage direct-current (HVDC) links (company claims) — bought by Japan's Hitachi in two steps: 80.1% agreed in December 2018 and closed on 1 July 2020, and the remaining 19.9% for ~$1.68bn, completed in late December 2022. Renamed Hitachi Energy in October 2021 and run from Zurich, it found itself in 2023–26 selling the grid's scarcest equipment: large power transformers with average lead times of ~128 weeks (Q2 2025, Wood Mackenzie) and HVDC converter stations reserved years ahead by European transmission operators (its share of TenneT's 2 GW programme was ~€13bn with Petrofac, 2023). Its answer has been the largest capacity build in its history — more than ~$9bn of investments committed globally (reported, Jan 2026), including ~$1bn in the US announced in September 2025 with ~$457m for a new large-power-transformer factory in South Boston, Virginia. It is the book's clearest case of transformers and HVDC as the grid's scarce equipment.

At a glance

Founded
Roots in ASEA (Sweden, 1883) and Brown, Boveri & Cie (Switzerland, 1891), merged as ABB in 1988; ABB Power Grids division (from 2016); Hitachi ABB Power Grids from 1 Jul 2020; Hitachi Energy from Oct 2021
Headquarters
Zurich, Switzerland; HVDC centre in Ludvika, Sweden; major US operations including South Boston, Virginia (transformers since 1968), Raleigh, North Carolina, and other plants (verify list)
Ownership / structure
Wholly owned subsidiary of Hitachi, Ltd. (Tokyo) since Dec 2022; listed Indian subsidiary Hitachi Energy India Ltd (NSE/BSE, majority-owned, verify stake)
Leadership (2026)
Andreas Schierenbeck (CEO, verify start date); Claudio Facchin (led ABB Power Grids and Hitachi Energy, 2016–2024, verify); within Hitachi's Green Energy & Mobility sector (verify current structure)
Business lines
Transformers (power, distribution, traction, service); HVDC and power-quality systems (FACTS, STATCOM); high-voltage products (gas-insulated switchgear, breakers, SF6-free EconiQ); grid automation and software; service
Scale
Revenue ~$20bn a year (secondary, 2025–26, verify against Hitachi segment reporting); ~50,000 employees (verify); Hitachi Energy India order backlog ~INR 29,555 crore (31 Mar 2026) and ~INR 32,222 crore (30 Jun 2026) (company)
Signature moves (incl. failures)
ABB's merger and HVDC franchise (1988–); ABB's decision to sell Power Grids after years of weak margins and offshore-connection losses (2014–18); Hitachi's acquisition (2018–20); full ownership and rename (2021–22); TenneT 2 GW HVDC framework (2023); SunZia HVDC converters in the US (2023–26); global transformer and HVDC capacity programme (2024–27); US manufacturing plan and South Boston (2025)

8 strategic moves analysed

Each one gets a full strategy file in the companion: context, the decision, the financing, what happened, and the lesson.

  1. 1988

    ABB Merger and the HVDC Franchise

    Acquisition or merger

  2. 2018

    ABB Decision to Sell Power Grids

    Divestment / failure (margins and project losses leading to a sale)

  3. 2020

    Hitachi Acquisition of ABB Power Grids

    Acquisition

  4. 2022

    Full Ownership and the Hitachi Energy Brand

    Acquisition (remaining minority) / strategy pivot (rebrand)

  5. 2023

    SunZia HVDC Converters

    Supply contract (US transmission)

  6. 2023

    TenneT 2GW HVDC Framework

    Offtake or supply contract (multi-year framework)

  7. 2024

    Global Transformer and HVDC Capacity Programme

    Capacity investment

  8. 2025

    US Manufacturing Plan and South Boston